Most past-due items sit with KCL Framing (237), Rite Rug Co. (151), Triple N drywall (133). 380 items were created in the last 30 days. Of 128 inspection lists on these jobs, 0 were performed in the last 30 days and 49 were closed with items still marked not inspected.
Active jobs plus any warranty job with open items. "Unit-located" is the share of items tied to a unit or room in the Procore location tree, which is what makes vendor and warranty reporting possible. Red rows have 50 or more items past due.
| Job | Items | Open | Past due | Oldest (days) | New 30d | Closed late | Unit-located | Insp. lists | Insp. 30d | Items not inspected | Convention flags |
|---|---|---|---|---|---|---|---|---|---|---|---|
| QTR - QT Apts II Bldg QWarranty | 975 | 321 | 321 | 753 | 0 | 97% | 98% | 3 | 0 | 60% | |
| QTR - QT Apts III Bldg CCourse of Construction | 599 | 214 | 214 | 314 | 113 | 89% | 92% | 6 | 0 | 57% | |
| QTR - QT Apts III Bldg GCourse of Construction | 237 | 194 | 88 | 214 | 189 | 65% | 98% | 1 | 0 | 80% | |
| QTR - QT Apts III Bldg FCourse of Construction | 108 | 108 | 108 | 172 | 0 | 91% | 0 | 0 | |||
| JPK - J67 HB4 270 DickensonWarranty | 178 | 88 | 88 | 1209 | 0 | 98% | 0% | 1 | 0 | 27% | items not located to a unit |
| WGR - Apts I - Bldg BPre-Construction | 104 | 62 | 62 | 36 | 6 | 55% | 91% | 1 | 0 | 88% | |
| QTR - QT Apts III Bldg BCourse of Construction | 58 | 57 | 57 | 13 | 22 | 0% | 2% | 0 | 0 | items not located to a unit | |
| GPK - Grant Pk Apts 5 Bldg AWarranty | 133 | 43 | 43 | 948 | 0 | 83% | 0% | 2 | 0 | 74% | items not located to a unit; items without a vendor |
| WGR - Apts I - Bldg ABidding | 113 | 33 | 33 | 774 | 3 | 94% | 99% | 0 | 0 | ||
| WGR - Apts I - Bldg DBidding | 37 | 20 | 13 | 29 | 22 | 100% | 22% | 0 | 0 | items not located to a unit | |
| QTR - QT Apts III Bldg ECourse of Construction | 65 | 19 | 19 | 92 | 0 | 100% | 97% | 0 | 0 | ||
| JPK - JP9 Apts AmenityWarranty | 13 | 12 | 12 | 774 | 0 | 0% | 0% | 1 | 0 | 0% | items not located to a unit |
| QTR - QT Apts III Community CenterCourse of Construction | 11 | 10 | 10 | 312 | 0 | 100% | 36% | 3 | 0 | 100% | items not located to a unit |
| GVX - GVX Apts II Bldg ZZCourse of Construction | 68 | 9 | 6 | 60 | 14 | 95% | 21% | 47 | 0 | 77% | items not located to a unit; 43 inspection lists closed with unanswered items |
| QTR - QT Apts III Maintenance BldgCourse of Construction | 9 | 8 | 8 | 196 | 0 | 100% | 0% | 1 | 0 | 77% | items not located to a unit |
| QTR - QT TH&F PB2 2248-2262Warranty | 8 | 8 | 8 | 901 | 0 | 0% | 0 | 0 | items not located to a unit | ||
| QTR - QT TH&F HB4 2867 KobukCourse of Construction | 115 | 7 | 7 | 326 | 0 | 100% | 99% | 8 | 0 | 95% | |
| WGR - Apts I - Bldg EBidding | 7 | 6 | 2 | 18 | 6 | 0% | 14% | 1 | 0 | 21% | items not located to a unit |
| QTR - QT Apts II Bldg P1-P2Warranty | 990 | 5 | 5 | 500 | 0 | 93% | 98% | 2 | 0 | 100% | |
| QTR - QT Apts III Bldg HCourse of Construction | 402 | 4 | 4 | 267 | 0 | 93% | 99% | 14 | 0 | 12% | 4 inspection lists closed with unanswered items |
| QTR - QT Retail Bldg M CoreWarranty | 34 | 4 | 4 | 580 | 0 | 93% | 0% | 0 | 0 | items not located to a unit | |
| WGR - Apts I - Bldg C - Comm CtrPre-Construction | 136 | 3 | 3 | 26 | 1 | 85% | 67% | 0 | 0 | ||
| QTR - QT Homes ph4 2374 Quarry TrailsCourse of Construction | 3 | 2 | 1 | 8 | 2 | 100% | 0% | 0 | 0 | items not located to a unit; items without a vendor | |
| QTR - QT Homes ph4 2380 Quarry TrailsCourse of Construction | 2 | 1 | 1 | 8 | 2 | 100% | 0% | 0 | 0 | items not located to a unit | |
| JPK - JP9 AptsWarranty | 647 | 1 | 1 | 700 | 0 | 89% | 0% | 3 | 0 | 0% | items not located to a unit |
| GPK - Grant Pk Apts 5 Bldg BWarranty | 59 | 1 | 1 | 556 | 0 | 93% | 0% | 1 | 0 | 49% | items not located to a unit |
| GVX - 810 Apts Bldg ZWarranty | 1 | 1 | 1 | 1117 | 0 | 0% | 0 | 0 | items not located to a unit | ||
| QTR - QT TH&F HB1 2891 KobukWarranty | 1 | 1 | 1 | 1281 | 0 | 0% | 0 | 0 | items not located to a unit | ||
| QTR - QT Apts III Bldg DCourse of Construction | 648 | 0 | 0 | 0 | 93% | 97% | 9 | 0 | 51% | 1 inspection list closed with unanswered items | |
| QTR - QT TH&F HB3 2842 GunnisonCourse of Construction | 99 | 0 | 0 | 0 | 100% | 100% | 3 | 0 | 63% | ||
| GVX - GVX Apts II Bldg QCourse of Construction | 26 | 0 | 0 | 0 | 100% | 27% | 4 | 0 | 43% | items not located to a unit; 1 inspection list closed with unanswered items | |
| QTR - QT Homes ph2 2853 Katmai Drive (2B)Course of Construction | 6 | 0 | 0 | 0 | 83% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| QTR - QT Homes ph2 2822 Kobuk Drive (8A)Course of Construction | 5 | 0 | 0 | 0 | 60% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| QTR - Qt Homes ph2 2828 Kobuk Drive (10A)Course of Construction | 4 | 0 | 0 | 0 | 50% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| QTR - QT Homes ph2 2792 Kobuk Drive (21)Course of Construction | 3 | 0 | 0 | 0 | 100% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| GVX - GVX Apts II Bldg Q & ZZ Pool & AmenityCourse of Construction | 2 | 0 | 0 | 0 | 100% | 100% | 0 | 0 | |||
| QTR - QT Homes ph2 2800 Kobuk Drive (4B)Course of Construction | 1 | 0 | 0 | 0 | 100% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| QTR - QT Homes ph2 2806 Kobuk Drive (23)Course of Construction | 1 | 0 | 0 | 0 | 100% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| JPK - J67 HB5 260 DickensonCourse of Construction | 0 | 0 | 0 | 0 | 1 | 0 | 0% | ||||
| QTR - QT Apts III Bldg ACourse of Construction | 0 | 0 | 0 | 0 | 1 | 0 | 100% | ||||
| QTR - QT TH&F HB5 2855 KobukCourse of Construction | 0 | 0 | 0 | 0 | 1 | 0 | 82% | ||||
| QTR - QT TH&F HB6 2830 GunnisonCourse of Construction | 0 | 0 | 0 | 0 | 1 | 0 | 100% | ||||
| QTR - QT Homes ph2 2812 Kobuk Drive (2B)Pre-Construction | 3 | 0 | 0 | 0 | 67% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| QTR - QT Homes ph2 2827 Katmai Drive (7A)Pre-Construction | 3 | 0 | 0 | 0 | 67% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| QTR - Qt Homes ph2 2851 Katmai Drive (2B)Pre-Construction | 2 | 0 | 0 | 0 | 0% | 0% | 0 | 0 | items not located to a unit; items without a vendor | ||
| QTR - QT TH&F PB3 2245-2259 Kings CanyonPre-Construction | 0 | 0 | 0 | 0 | 2 | 0 | 99% | ||||
| QTR - QT TH&F PB4 2269-2283 Kings CanyonPre-Construction | 0 | 0 | 0 | 0 | 1 | 0 | 100% |
All jobs, all time, vendors with 10 or more items. "Closed late" is the share of closed items closed after the due date; "median late" is days past due at close. Red rows have 50 or more items past due today or close late 90 percent of the time. A vendor can appear under more than one Procore company record (Romanoff has three).
| Business Partner | Items | Jobs | Open | Past due | Closed late | Median days late |
|---|---|---|---|---|---|---|
| KCL Framing | 894 | 24 | 243 | 237 | 95% | 78 |
| Rite Rug Co. | 746 | 21 | 160 | 151 | 92% | 24 |
| Triple N drywall | 634 | 13 | 133 | 133 | 99% | 24 |
| Romanoff Electric, Inc | 574 | 13 | 102 | 90 | 93% | 19 |
| Thrive Construction | 508 | 33 | 56 | 52 | 93% | 36 |
| Contract Lumber | 434 | 14 | 46 | 45 | 98% | 62 |
| Foundation Millwork & Stone | 418 | 9 | 74 | 74 | 96% | 23 |
| Northern Window & Door | 311 | 8 | 14 | 14 | 96% | 80 |
| Sims-Lohman, Inc | 297 | 13 | 43 | 31 | 90% | 20 |
| Holmes Lumber | 258 | 21 | 73 | 58 | 70% | 5 |
| (no vendor assigned) | 257 | 42 | 0 | 0 | 89% | 61 |
| Precision Wall Systems LLC | 244 | 9 | 77 | 53 | 83% | 8 |
| Romanoff Electric Residential LLC | 243 | 17 | 20 | 20 | 97% | 57 |
| TG Plumbing & Mechanical, Inc. | 231 | 9 | 21 | 10 | 91% | 10 |
| JB Hunt | 215 | 5 | 2 | 2 | 100% | 19 |
| Romanoff Heating & Cooling | 212 | 17 | 10 | 10 | 92% | 23 |
| RBS Plumbing, LLC | 207 | 2 | 10 | 10 | 99% | 18 |
| Best Impression Painting LLC | 170 | 4 | 57 | 35 | 96% | 12 |
| Whirlpool Corporation | 168 | 7 | 6 | 6 | 99% | 19 |
| Granite Direct | 147 | 9 | 10 | 10 | 91% | 19 |
| James Blinds | 137 | 9 | 10 | 10 | 90% | 4 |
| GE Appliances | 127 | 8 | 30 | 30 | 94% | 42 |
| Mike Baumann Plumbing | 114 | 11 | 3 | 3 | 91% | 8 |
| Colonial Heating & Cooling Co., Inc. | 95 | 5 | 4 | 4 | 85% | 13 |
| Whirlpool | 70 | 1 | 0 | 0 | 100% | 14 |
| All Secured Security Services LLC | 48 | 13 | 9 | 8 | 90% | 13 |
| K.E.P. Electric, Inc | 48 | 5 | 4 | 3 | 80% | 10 |
| C & M Services | 46 | 1 | 0 | 0 | 100% | 19 |
| Gutridge | 42 | 8 | 0 | 0 | 98% | 60 |
| Wolfrum Roofing & Exteriors, LLC | 38 | 6 | 7 | 7 | 94% | 192 |
| Surface Tech Inc | 28 | 6 | 9 | 9 | 84% | 6 |
| Elflein Property Solutions | 26 | 5 | 8 | 8 | 94% | 75 |
| S.A. Comunale | 26 | 6 | 17 | 17 | 78% | 18 |
| Interactive Protection Services | 17 | 2 | 1 | 1 | 100% | 25 |
| Hamilton Parker | 13 | 6 | 1 | 1 | 100% | 126 |
| Design Plumbing Inc. | 11 | 1 | 0 | 0 | 100% | 45 |
Expand a job for the item, the Business Partner it is assigned to, the location and days past due. Items with no vendor are the superintendent's to assign.
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 290 | 583 QA WINDOW PUNCH | Northern Window & Door | 2024-09-13 | 753 | |
| 295 | 585 QA WINDOW PUNCH | Northern Window & Door | 2024-09-13 | 753 | |
| 304 | 587 QA WINDOW PUNCH | Northern Window & Door | 2024-09-13 | 753 | |
| 297 | Door Damage | Northern Window & Door | 2nd Floor Units>212 | 2024-09-14 | 752 |
| 291 | 583 QA SURFACE REPAIR | Thrive Construction | 2024-09-19 | 747 | |
| 307 | 589 QA SURFACE REPAIR | Thrive Construction | 2024-09-19 | 747 | |
| 420 | Damaged downspout | Wolfrum Roofing & Exteriors, LLC | 4th Floor Units>418 | 2024-10-20 | 716 |
| 448 | Downspout | Wolfrum Roofing & Exteriors, LLC | 4th Floor Units>414 | 2024-10-21 | 715 |
| 455 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>412 | 2024-10-21 | 715 |
| 457 | Drywall/Caulk/paint | Triple N drywall | 4th Floor Units>412 | 2024-10-21 | 715 |
| 461 | Balcony door/decking | KCL Framing | 4th Floor Units>412 | 2024-10-24 | 712 |
| 464 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>419 | 2024-10-24 | 712 |
| 465 | Drywall/Caulk/paint | Triple N drywall | 4th Floor Units>419 | 2024-10-24 | 712 |
| 467 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>410 | 2024-10-24 | 712 |
| 469 | Tub slab/countertops/sink | Granite Direct | 4th Floor Units | 2024-10-24 | 712 |
| 470 | Balcony door/decking | KCL Framing | 4th Floor Units>410 | 2024-10-24 | 712 |
| 472 | Drywall/Caulk/paint | Triple N drywall | 4th Floor Units>417 | 2024-10-24 | 712 |
| 473 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>417 | 2024-10-24 | 712 |
| 475 | Drywall/Caulk/paint | Triple N drywall | 4th Floor Units>408 | 2024-10-24 | 712 |
| 477 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>408 | 2024-10-24 | 712 |
| 479 | Balcony door/decking | KCL Framing | 4th Floor Units>408 | 2024-10-24 | 712 |
| 482 | Drywall/Caulk/paint | Triple N drywall | 4th Floor Units>413 | 2024-10-24 | 712 |
| 483 | Balcony door/decking | KCL Framing | 4th Floor Units>413 | 2024-10-24 | 712 |
| 486 | Balcony door/decking | KCL Framing | 4th Floor Units>411 | 2024-10-24 | 712 |
| 489 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>409 | 2024-10-24 | 712 |
| 491 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>406 | 2024-10-24 | 712 |
| 495 | Balcony door/decking | KCL Framing | 4th Floor Units>406 | 2024-10-24 | 712 |
| 506 | Grout/caulking/flooring | Rite Rug Co. | 4th Floor Units>404 | 2024-10-24 | 712 |
| 513 | Balcony door/decking | KCL Framing | 4th Floor Units>403 | 2024-10-24 | 712 |
| 518 | Balcony door/decking | KCL Framing | 4th Floor Units>402 | 2024-10-24 | 712 |
| 523 | Drywall/Caulk/paint | Triple N drywall | 4th Floor Units>422 | 2024-10-25 | 711 |
| 524 | Balcony door/decking | KCL Framing | 4th Floor Units>422 | 2024-10-25 | 711 |
| 528 | Drywall/Caulk/paint | Triple N drywall | 3rd Floor Units>301 | 2024-10-25 | 711 |
| 532 | Grout/caulking/flooring | Rite Rug Co. | 3rd Floor Units>302 | 2024-10-25 | 711 |
| 533 | Drywall/Caulk/paint | Triple N drywall | 3rd Floor Units>302 | 2024-10-25 | 711 |
| 535 | Electrical | Romanoff Electric Residential LLC, Romanoff Electric, Inc | 3rd Floor Units | 2024-10-25 | 711 |
| 536 | Drywall/Caulk/paint | Triple N drywall | 3rd Floor Units>303 | 2024-10-25 | 711 |
| 539 | Grout/caulking/flooring | Rite Rug Co. | 3rd Floor Units>304 | 2024-10-25 | 711 |
| 542 | Grout/caulking/flooring | Rite Rug Co. | 3rd Floor Units>305 | 2024-10-25 | 711 |
| 543 | Drywall/Caulk/paint | Triple N drywall | 3rd Floor Units>305 | 2024-10-25 | 711 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 2 | 101 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 101 5B O.C. | 2025-11-26 | 314 |
| 3 | 102 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2025-11-26 | 314 |
| 4 | 103 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 103 13B | 2025-11-26 | 314 |
| 5 | 104 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 104 13B | 2025-11-26 | 314 |
| 6 | 105 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 105 4B | 2025-11-26 | 314 |
| 7 | 106 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 106 4B | 2025-11-26 | 314 |
| 8 | 107 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 107 4B | 2025-11-26 | 314 |
| 9 | 108 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 108 4B | 2025-11-28 | 312 |
| 10 | 109 KCL Frame punch | KCL Framing | 2025-11-28 | 312 | |
| 11 | 110 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 110 3B | 2025-12-05 | 305 |
| 12 | 111 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>MECH. 111 | 2025-12-05 | 305 |
| 13 | 112 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 112 3B | 2025-12-05 | 305 |
| 15 | 113 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 113 5B | 2025-12-05 | 305 |
| 16 | 115 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 115 4B | 2025-12-09 | 301 |
| 17 | 116 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 116 4B | 2025-12-09 | 301 |
| 18 | 117 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 117 4B | 2025-12-11 | 299 |
| 19 | 118 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 118 3B | 2025-12-11 | 299 |
| 20 | 119 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 119 13B | 2025-12-22 | 288 |
| 21 | 120 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 120 7B | 2025-12-22 | 288 |
| 22 | 121 KCL Frame punch | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 121 5B O.C. | 2025-12-23 | 287 |
| 23 | Add 1 jack to both sides of east bedroom window opening. H3 headers need 4 jacks each end | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 119 13B | 2026-01-09 | 270 |
| 24 | Remove floor trusses above fire suppression chase. Add girder truss | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 122 5B O.C. | 2026-01-12 | 267 |
| 25 | Straighten/level wall and openings on porch/living room wall and add jack stud to each end. Lower corner window to correct height. | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2026-01-12 | 267 |
| 26 | Add hangers and pack studs to girder truss above chase in bathroom | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 101 5B O.C. | 2026-01-12 | 267 |
| 27 | Close in F type windows in living and bedrooms to correct height opening. Should be 78ro, not 88" | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 103 13B | 2026-01-12 | 267 |
| 28 | Add 2 jacks under each side of header per schedule | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 118 3B | 2026-01-12 | 267 |
| 29 | Install LVL header on bedroom window per schedule | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 115 4B | 2026-01-12 | 267 |
| 30 | Install LVL header above bedroom window | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 117 4B | 2026-01-12 | 267 |
| 32 | 202 Frame punch KCL | KCL Framing | 2026-03-02 | 218 | |
| 33 | 203 Frame punch KCL | KCL Framing | 2026-03-02 | 218 | |
| 38 | 208 Frame punch KCL | KCL Framing | 2026-03-02 | 218 | |
| 41 | 210 Frame punch KCL | KCL Framing | 2026-03-02 | 218 | |
| 44 | 214 Frame punch KCL | KCL Framing | 2026-03-03 | 217 | |
| 53 | Wall, window, and door opening not level | KCL Framing | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2026-03-05 | 215 |
| 56 | 303 Frame punch KCL | KCL Framing | 2026-03-06 | 214 | |
| 102 | 422 Frame punch KCL | KCL Framing | BUILDING C>OVERALL - FOURTH FLOOR PLAN>UNIT 422 5B O.C. | 2026-03-17 | 203 |
| 128 | 102 Romanoff Box Punch | Romanoff Electric, Inc | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2026-05-04 | 155 |
| 129 | 103 Romanoff Box Punch | Romanoff Electric, Inc | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 103 13B | 2026-05-04 | 155 |
| 130 | 104 Romanoff Box Punch | Romanoff Electric, Inc | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 104 13B | 2026-05-04 | 155 |
| 131 | 105 Romanoff Box Punch | Romanoff Electric, Inc | BUILDING C>OVERALL - FIRST FLOOR PLAN>UNIT 105 4B | 2026-05-04 | 155 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 1 | Kitchen island short. Should be 87” inside clearance | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 106 8B | 2026-03-06 | 214 |
| 3 | 101 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 101 5B O.C. | 2026-03-17 | 203 |
| 4 | 102 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2026-03-17 | 203 |
| 5 | 103 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 103 8B | 2026-03-17 | 203 |
| 6 | 104 KCL Frame Punch | KCL Framing | 2026-03-17 | 203 | |
| 7 | 105 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 105 3B | 2026-03-17 | 203 |
| 8 | 106 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 106 8B | 2026-03-17 | 203 |
| 9 | 107 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 107 8B | 2026-03-17 | 203 |
| 10 | 108 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 108 4B | 2026-03-17 | 203 |
| 11 | 109 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 109 13B | 2026-03-17 | 203 |
| 12 | 110 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 110 7A | 2026-03-17 | 203 |
| 13 | 111 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 111 5B O.C. | 2026-03-17 | 203 |
| 14 | 112 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - FIRST FLOOR PLAN>UNIT 112 5B O.C. | 2026-03-17 | 203 |
| 15 | 201 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 201 5 O.C. | 2026-03-19 | 201 |
| 16 | 202 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 202 5 O.C. | 2026-03-19 | 201 |
| 17 | 203 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 203 8 | 2026-03-19 | 201 |
| 18 | 204 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 204 13 | 2026-03-19 | 201 |
| 19 | 205 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 205 3 | 2026-03-19 | 201 |
| 20 | 206 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 206 8 | 2026-03-19 | 201 |
| 21 | 207 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 207 8 | 2026-03-19 | 201 |
| 22 | 208 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 208 4 | 2026-03-19 | 201 |
| 23 | 209 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 209 13 | 2026-03-19 | 201 |
| 24 | 210 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 210 7 | 2026-03-19 | 201 |
| 25 | 211 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 211 5 O.C. | 2026-03-19 | 201 |
| 26 | 212 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - SECOND FLOOR PLAN>UNIT 212 5 O.C. | 2026-03-19 | 201 |
| 27 | 301 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 301 5 O.C. | 2026-03-26 | 194 |
| 28 | 302 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 302 5 O.C. | 2026-03-26 | 194 |
| 29 | 303 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 303 8 | 2026-03-26 | 194 |
| 30 | 304 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 304 13 | 2026-03-26 | 194 |
| 31 | 305 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 305 3 | 2026-03-26 | 194 |
| 32 | 306 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 306 8 | 2026-03-26 | 194 |
| 33 | 307 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 307 8 | 2026-03-26 | 194 |
| 34 | 308 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 308 4 | 2026-03-26 | 194 |
| 35 | 309 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 309 13 | 2026-03-26 | 194 |
| 36 | 310 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 310 7 | 2026-03-26 | 194 |
| 37 | 311 KCL Frame Punch | KCL Framing | BUILDING G>OVERALL - THIRD FLOOR PLAN>UNIT 311 5 O.C. | 2026-03-26 | 194 |
| 40 | Holmes Window Punch | Holmes Lumber | 2026-04-23 | 166 | |
| 41 | Romanoff Third Floor Box Punch | Romanoff Electric, Inc | 2026-05-15 | 144 | |
| 42 | Romanoff Second Floor Box Punch | Romanoff Electric, Inc | 2026-05-15 | 144 | |
| 43 | Romanoff Third Floor Lighting Punch | Romanoff Electric, Inc | BUILDING G>OVERALL - THIRD FLOOR PLAN | 2026-05-15 | 144 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 1 | Window rough opening needs fixed | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 209 5B | 2026-04-17 | 172 |
| 2 | Window rough opening needs fixed | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 207 4B | 2026-04-17 | 172 |
| 3 | Window rough opening needs fixed | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 208 4B | 2026-04-17 | 172 |
| 4 | Window rough opening needs fixed | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 205 4B | 2026-04-17 | 172 |
| 5 | Truss hanging down too low | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 122 5B O.C. | 2026-04-20 | 169 |
| 6 | Missing chase wall | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 122 5B O.C. | 2026-04-20 | 169 |
| 7 | Floor truss needs moved for shower drain above | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 101 5B O.C. | 2026-04-20 | 169 |
| 8 | Move truss in laundry area | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2026-04-24 | 165 |
| 9 | Move truss for toilet drain penitrtion | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 118 3B | 2026-04-24 | 165 |
| 10 | 101 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 101 5B O.C. | 2026-05-22 | 137 |
| 11 | 102 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2026-05-22 | 137 |
| 12 | 103 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 103 13B | 2026-05-22 | 137 |
| 13 | 104 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 104 13B | 2026-05-22 | 137 |
| 14 | 105 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 105 4B | 2026-05-22 | 137 |
| 15 | 106 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 106 4B | 2026-05-22 | 137 |
| 16 | 107 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 107 4B | 2026-05-22 | 137 |
| 17 | 108 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 108 4B | 2026-05-22 | 137 |
| 18 | 109 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 109 5B TUB OPTION | 2026-05-22 | 137 |
| 19 | 110 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 110 3B | 2026-05-22 | 137 |
| 20 | 112 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 112 3B | 2026-05-22 | 137 |
| 21 | 114 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 114 4B | 2026-05-22 | 137 |
| 22 | 115 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 115 4B TUB OPTION | 2026-05-22 | 137 |
| 23 | 116 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 116 4B | 2026-05-22 | 137 |
| 24 | 117 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 117 4B | 2026-05-22 | 137 |
| 25 | 118 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 118 3B | 2026-05-22 | 137 |
| 26 | 119 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 119 13B | 2026-05-22 | 137 |
| 27 | 122 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - FIRST FLOOR PLAN>UNIT 122 5B O.C. | 2026-05-22 | 137 |
| 28 | 201 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 201 5B O.C. | 2026-05-25 | 134 |
| 29 | 202 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 202 5B O.C. | 2026-05-25 | 134 |
| 30 | 203 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 203 13B | 2026-05-25 | 134 |
| 31 | 204 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 204 13B | 2026-05-25 | 134 |
| 32 | 205 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 205 4B | 2026-05-25 | 134 |
| 33 | 206 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 206 4B | 2026-05-25 | 134 |
| 34 | 207 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 207 4B | 2026-05-25 | 134 |
| 35 | 208 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 208 4B | 2026-05-25 | 134 |
| 36 | 209 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 209 5B | 2026-05-25 | 134 |
| 37 | 210 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 210 3B | 2026-05-25 | 134 |
| 38 | 211 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 211 3B | 2026-05-25 | 134 |
| 39 | 212 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 212 3B | 2026-05-26 | 133 |
| 40 | 213 KCL Frame Punch | KCL Framing | BUILDING F>OVERALL - SECOND FLOOR PLAN>UNIT 213 5B | 2026-05-26 | 133 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 105 | 202 - Remove 2 x 4 from top of laundry room | Contract Lumber | 2023-06-15 | 1209 | |
| 138 | Whole Building - Add blocking for laundry cabinets | Contract Lumber | 2023-06-15 | 1209 | |
| 106 | 203 - Remove 2 x 4 from kitchen wall | Contract Lumber | 2023-06-15 | 1209 | |
| 137 | Whole Building - Improve temp railings | Contract Lumber | 2023-06-15 | 1209 | |
| 102 | 201 - Crowned stud in the bathtub stall | Contract Lumber | 2023-06-15 | 1209 | |
| 104 | 202 - Tub corners are not square | Contract Lumber | 2023-06-15 | 1209 | |
| 103 | 202 - Bathtub opening to be 5 foot wide on the money | Contract Lumber | 2023-06-15 | 1209 | |
| 107 | 203 - Crown stud in the bathtub stall | Contract Lumber | 2023-06-15 | 1209 | |
| 109 | 203 - Need blocking for bathroom sink | Contract Lumber | 2023-06-15 | 1209 | |
| 110 | 204 - Crown stud in the bathtub stall | Contract Lumber | 2023-06-15 | 1209 | |
| 111 | 204 - Need one more piece of blocking | Contract Lumber | 2023-06-15 | 1209 | |
| 112 | 204 - Need closet door next to the entry door | Contract Lumber | 2023-06-15 | 1209 | |
| 101 | 201 - Blocking for kitchen wall | Contract Lumber | 2023-06-15 | 1209 | |
| 113 | 204 - Blocking for the kitchen sink | Contract Lumber | 2023-06-15 | 1209 | |
| 108 | 203 - Need blocking for bathroom in hallway | Contract Lumber | 2023-06-15 | 1209 | |
| 143 | Fourth floor corridor need hangers, hangers need nails | Contract Lumber | 2023-06-15 | 1209 | |
| 142 | Third floor north stair tower bolts need tightened down | Contract Lumber | 2023-06-15 | 1209 | |
| 141 | Third floor south stair tower need bolts fastened down to the ledger, tighten bolts on opposite side of wall | Contract Lumber | 2023-06-15 | 1209 | |
| 140 | Second floor need hanger | Contract Lumber | 2023-06-15 | 1209 | |
| 139 | Second floor north stair tower needs bolts fastened to ledger | Contract Lumber | 2023-06-15 | 1209 | |
| 136 | Need platforms in elevator shaft | Contract Lumber | 2023-06-15 | 1209 | |
| 161 | Unit 401. Dent in fridge door.  Unit 401. | GE Appliances | 2024-10-03 | 733 | |
| 164 | Unit 401. Finish base left of water heater and laundry room.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 167 | Unit 401. Pocket door guides missing laundry room.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 168 | Unit 401. Repair scratches to exterior of sliding door frames.  | Surface Tech Inc | 2024-10-03 | 733 | |
| 169 | Unit 401. Missing doorstop on hall bath door.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 171 | Unit 401. Bedroom number one missing ball catch at top of closet door.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 172 | Unit 401. Guest bathroom mirror is chipped. Needs replaced.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 177 | Unit 404. Repair weatherstrip at bottom of sliding door.  Unit 404. | Rite Rug Co. | 2024-10-03 | 733 | |
| 178 | Unit 404. Fill all nail holes in cabinet trim white. Paint edges of toe kick in kitchen white.  Unit 404. | Rite Rug Co. | 2024-10-03 | 733 | |
| 179 | Unit 404. Adjust all cabinet faces.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 180 | Unit 404. Range hood - gap at bottom of shroud. Metal buckled at top of hood assembly. Remove all plastic.  | GE Appliances | 2024-10-03 | 733 | |
| 181 | Unit 404. Finish install of microwave drawer. Need wood fillers around face.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 182 | Unit 404. Repair and reinstall pocket door hardware in the laundry room.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 183 | Unit 404. Pocket door two laundry room is rubbing. Either adjust hardware or replace slab.  is also missing second door guide at bottom.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 186 | Unit 404. Touch up all scratches to exterior of sliding door.  | Surface Tech Inc | 2024-10-03 | 733 | |
| 188 |  Unit 404. Repair wall around toilet supply line. Hall bath.  | Triple N drywall | 2024-10-03 | 733 | |
| 189 | Unit 404. Rehang hall vanity mirror to be centered above cabinet.  | Rite Rug Co. | 2024-10-03 | 733 | |
| 191 | Unit 404. Owner’s bath exhaust fan not turning on.  | Romanoff Electric Residential LLC, Romanoff Heating & Cooling | 2024-10-03 | 733 | |
| 192 | Unit 402. Peep hole missing from front door.  | Thrive Construction | 2024-10-03 | 733 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 11 | Bath closet drywall needed | Precision Wall Systems LLC | 1st Floor | 2026-08-31 | 36 |
| 20 | Float ceiling in 303 | Precision Wall Systems LLC | 3rd Floor>303 | 2026-08-31 | 36 |
| 21 | Brick not sitting on brick ledge. Install lentils/go down to ledge. | Carlisle Masonry | 1st Floor | 2026-08-31 | 36 |
| 26 | Missing light in kitchen | Precision Wall Systems LLC | 3rd Floor>301 | 2026-08-31 | 36 |
| 28 | Missing light | Precision Wall Systems LLC | 3rd Floor>306 | 2026-08-31 | 36 |
| 33 | 108 Drywall | Precision Wall Systems LLC | 1st Floor>108 | 2026-08-31 | 36 |
| 35 | 203 Drywall | Precision Wall Systems LLC | 1st Floor>108 | 2026-08-31 | 36 |
| 36 | 208 Missing light | Precision Wall Systems LLC | 2nd Floor>208 | 2026-08-31 | 36 |
| 38 | 203 Drywall | Precision Wall Systems LLC | 2nd Floor>203 | 2026-08-31 | 36 |
| 41 | Patch owner closer at baseboard unit 311 | Precision Wall Systems LLC | 3rd Floor>311 | 2026-08-31 | 36 |
| 42 | Complete hardware install 313 | Foundation Millwork & Stone | 3rd Floor>313 | 2026-08-31 | 36 |
| 43 | Complete cabinet/hardware install 314 | Foundation Millwork & Stone | 3rd Floor>314 | 2026-08-31 | 36 |
| 44 | Complete the cab/hardware install in unit 307 | Foundation Millwork & Stone | 3rd Floor>307 | 2026-08-31 | 36 |
| 46 | Complete cabinet/hardware install 304 | Foundation Millwork & Stone | 3rd Floor>304 | 2026-08-31 | 36 |
| 47 | Complete cab/hardware install 204 | Foundation Millwork & Stone | 2nd Floor>204 | 2026-08-31 | 36 |
| 51 | Finish hardware install 301 | Foundation Millwork & Stone | 3rd Floor>301 | 2026-08-31 | 36 |
| 52 | Finish hardware install 302 | Foundation Millwork & Stone | 3rd Floor>302 | 2026-08-31 | 36 |
| 53 | Finish hardware install 303 | Foundation Millwork & Stone | 3rd Floor>303 | 2026-08-31 | 36 |
| 54 | Finish hardware install 305 | Foundation Millwork & Stone | 3rd Floor>305 | 2026-08-31 | 36 |
| 55 | Finish hardware install 306 | Foundation Millwork & Stone | 3rd Floor>306 | 2026-08-31 | 36 |
| 57 | Finish hardware install 309 | Foundation Millwork & Stone | 3rd Floor>309 | 2026-08-31 | 36 |
| 59 | Wrong color too 306 kitchen | Foundation Millwork & Stone | 3rd Floor | 2026-08-31 | 36 |
| 60 | 112 Cabinets | Foundation Millwork & Stone | 1st Floor>112 | 2026-08-31 | 36 |
| 61 | 110 Cabinets | Foundation Millwork & Stone | 1st Floor>110 | 2026-08-31 | 36 |
| 62 | 111 Cabinets | Foundation Millwork & Stone | 1st Floor>111 | 2026-08-31 | 36 |
| 63 | 102 Cabinets | Foundation Millwork & Stone | 1st Floor>102 | 2026-08-31 | 36 |
| 64 | 204 Cabinets | Foundation Millwork & Stone | 2nd Floor>204 | 2026-08-31 | 36 |
| 65 | 104 Cabinets | Foundation Millwork & Stone | 1st Floor>104 | 2026-08-31 | 36 |
| 66 | 211 Cabinets | Foundation Millwork & Stone | 2nd Floor>211 | 2026-08-31 | 36 |
| 67 | 213 Cabinets | Foundation Millwork & Stone | 2nd Floor>213 | 2026-08-31 | 36 |
| 68 | 103 Cabinets | Foundation Millwork & Stone | 1st Floor>103 | 2026-08-31 | 36 |
| 70 | 214 Countertops | Foundation Millwork & Stone | 2nd Floor>214 | 2026-08-31 | 36 |
| 71 | 311 Countertops | Foundation Millwork & Stone | 3rd Floor>311 | 2026-08-31 | 36 |
| 72 | 310 Countertops | Foundation Millwork & Stone | 3rd Floor>310 | 2026-08-31 | 36 |
| 73 | 307 Countertops | Foundation Millwork & Stone | 3rd Floor>307 | 2026-08-31 | 36 |
| 74 | 306 Countertops | Foundation Millwork & Stone | 3rd Floor>306 | 2026-08-31 | 36 |
| 75 | 305 Countertops | Foundation Millwork & Stone | 3rd Floor>306 | 2026-08-31 | 36 |
| 76 | 305 cabinets | Foundation Millwork & Stone | 3rd Floor>305 | 2026-08-31 | 36 |
| 77 | 304 Cabinets | Foundation Millwork & Stone | 3rd Floor>304 | 2026-08-31 | 36 |
| 78 | 304 Countertops | Foundation Millwork & Stone | 3rd Floor>304 | 2026-08-31 | 36 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 1 | Unit 201 patio has no zip tape on outside corners or below the decking | KCL Framing | 2026-09-23 | 13 | |
| 2 | No zip tape on outside corners or below decking on patio | KCL Framing | 2026-09-23 | 13 | |
| 4 | X19 Stack Units Bedroom Window in Wrong Location | KCL Framing | Building B>OVERALL - FIRST FLOOR PLAN>UNIT 119 13B | 2026-09-23 | 13 |
| 5 | Missing stud corner of plumbing wall in bathroom 421 | KCL Framing | 2026-09-23 | 13 | |
| 6 | #422 missing stud on plumbing wall | KCL Framing | 2026-09-23 | 13 | |
| 7 | 117 missing bedroom window | Holmes Lumber | 2026-09-23 | 13 | |
| 8 | 119 Both (108”x78”) windows sagging in the middle by 1/2” -Broken upper sash in bedroom | KCL Framing | 2026-09-23 | 13 | |
| 11 | 316 Replace king stud that is nearly attached | KCL Framing | 2026-09-23 | 13 | |
| 12 | 315 Replace broken stud in on plumbing wall of tub. It’s cracked where the glass goes | KCL Framing, Thrive Construction | 2026-09-23 | 13 | |
| 16 | 305 Shower not square Needs to come out 1/2” in the corner | KCL Framing, Thrive Construction | 2026-09-23 | 13 | |
| 20 | 302 Add stud in master shower plumbing wall @ 36” off back wall for blocking | KCL Framing, Thrive Construction | 2026-09-23 | 13 | |
| 21 | 222 replace king stud cut out by electrician | KCL Framing, Thrive Construction | 2026-09-23 | 13 | |
| 23 | 220 Stud in back of tub area not plane | Wallace Construction | 2026-09-23 | 13 | |
| 29 | 213 King stud cut | Wallace Construction | 2026-09-23 | 13 | |
| 30 | 212 Header sags 5/8” | Wallace Construction | 2026-09-23 | 13 | |
| 33 | 2 upper sashes in 2nd floor lobby cracked | Holmes Lumber | 2026-09-23 | 13 | |
| 34 | 209 Add stud in tub plumbing wall at 31 1/4 Blocking for glass door | Thrive Construction | 2026-09-23 | 13 | |
| 38 | 208 Cracked top sash in B.R. | Holmes Lumber | 2026-09-23 | 13 | |
| 40 | 207 Add stud in tub chase wall at 31 1/4” for blocking | Thrive Construction | 2026-09-23 | 13 | |
| 42 | 204 Tub needs blocking at 31 1/4” on plumbing wall | Thrive Construction | 2026-09-23 | 13 | |
| 43 | 102 Broken bottom sash in B.R. | Holmes Lumber | 2026-09-23 | 13 | |
| 44 | 102 Add nailer at.corner of knee wall | Thrive Construction | 2026-09-23 | 13 | |
| 46 | 104 | Thrive Construction | 2026-09-23 | 13 | |
| 47 | 104 Shower needs stud at 36” | Thrive Construction | 2026-09-23 | 13 | |
| 48 | 104 Shower needs stud at 36” | Thrive Construction | 2026-09-23 | 13 | |
| 49 | 104 Broken upper sash needs replaced in B.R. | Holmes Lumber | 2026-09-23 | 13 | |
| 50 | 106 Bottom plate off 1/2” | Thrive Construction | 2026-09-23 | 13 | |
| 51 | 105 Header not flush with bottom plate | Thrive Construction | 2026-09-23 | 13 | |
| 52 | 109 Replace missing king studs at unit entry | Thrive Construction | 2026-09-23 | 13 | |
| 53 | 101 Replace missing king studs | Thrive Construction | 2026-09-23 | 13 | |
| 54 | 102 | Thrive Construction | 2026-09-23 | 13 | |
| 55 | 102 Replace missing king studs | Thrive Construction | 2026-09-23 | 13 | |
| 56 | 109 Header hangs 1/2” over bottom plate | Thrive Construction | 2026-09-23 | 13 | |
| 57 | 110 Missing studs at 36” on chase wall for blocking | Thrive Construction | 2026-09-23 | 13 | |
| 58 | 110 HEADER & bottom plate out 1/2” | Thrive Construction | 2026-09-23 | 13 | |
| 59 | 113 Add stud at 36” for blocking | Thrive Construction | 2026-09-23 | 13 | |
| 60 | 113 Add 2 King studs that were cut out | Thrive Construction | 2026-09-23 | 13 | |
| 61 | 113 Header sticks out 1/2” over from bottom plate | Thrive Construction | 2026-09-23 | 13 | |
| 62 | 113 Bottom plate of header sags 1/2” | Thrive Construction | 2026-09-23 | 13 | |
| 63 | 115 Tub area needs studs at 31 1/4” on both sides for blocking | Thrive Construction | 2026-09-23 | 13 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 101 | 201A Paint/Drywall | Triple N drywall | 2024-03-02 | 948 | |
| 103 | 202A Closet Shelving | Rite Rug Co. | 2024-03-02 | 948 | |
| 26 | 201A Punch S.A.C | S.A. Comunale | 2024-03-22 | 928 | |
| 45 | 302A Punch S.A.C | S.A. Comunale | 2024-03-23 | 927 | |
| 28 | 202A Punch S.A.C | S.A. Comunale | 2024-03-26 | 924 | |
| 32 | 203A Punch S.A.C | S.A. Comunale | 2024-03-26 | 924 | |
| 40 | 204A Punch S.A.C | S.A. Comunale | 2024-03-26 | 924 | |
| 52 | 304A Punch S.A.C | S.A. Comunale | 2024-03-26 | 924 | |
| 43 | 301A Punch S.A.C | S.A. Comunale | 2024-03-27 | 923 | |
| 50 | 303A Punch S.A.C | S.A. Comunale | 2024-03-27 | 923 | |
| 56 | 305A Punch S.A.C | S.A. Comunale | 2024-03-27 | 923 | |
| 61 | 306A Punch S.A.C | S.A. Comunale | 2024-03-29 | 921 | |
| 69 | 206A Punch Plumbing | Mike Baumann Plumbing | 2024-03-29 | 921 | |
| 85 | 107A Punch S.A.C. | S.A. Comunale | 2024-03-29 | 921 | |
| 87 | 108A Punch Plumbing | Mike Baumann Plumbing | 2024-03-29 | 921 | |
| 89 | 108A Punch S.A.C. | S.A. Comunale | 2024-03-29 | 921 | |
| 105 | 203A Closet Shelving | Rite Rug Co. | 2024-03-30 | 920 | |
| 112 | 302A Paint/Drywall | Triple N drywall | 2024-03-31 | 919 | |
| 95 | 101A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 97 | 102A Shelving | Rite Rug Co. | 2024-04-02 | 917 | |
| 98 | 102A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 99 | 103A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 100 | 104A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 104 | 202A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 106 | 203A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 107 | 204A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 109 | 301A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 110 | 302A S.A.C | S.A. Comunale | 2024-04-02 | 917 | |
| 113 | 303A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 115 | 304A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 116 | 105A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 117 | 106A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 120 | 107A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 121 | 108A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 122 | 205A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 124 | 206A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 126 | 207A Shelving | Rite Rug Co. | 2024-04-02 | 917 | |
| 127 | 207A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 129 | 305A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 | |
| 130 | 306A Paint/Drywall | Triple N drywall | 2024-04-02 | 917 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 93 | 102 countertop | Foundation Millwork & Stone | 1st floor>102 | 2024-08-23 | 774 |
| 33 | 111 Broken window | Holmes Lumber | 1st floor>111 | 2026-07-23 | 75 |
| 34 | 210 broken windows | Holmes Lumber | 2nd Floor>210 | 2026-07-24 | 74 |
| 42 | 101 Cabinets | Foundation Millwork & Stone | 1st floor>101 | 2026-08-03 | 64 |
| 43 | 101 Drywall | Precision Wall Systems LLC | 1st floor>101 | 2026-08-03 | 64 |
| 67 | 111 Cabinets | Foundation Millwork & Stone | 1st floor>111 | 2026-08-05 | 62 |
| 68 | 109 Cabinets | Foundation Millwork & Stone | 1st floor>109 | 2026-08-05 | 62 |
| 69 | 107 Cabinets | Foundation Millwork & Stone | 1st floor>107 | 2026-08-05 | 62 |
| 66 | 302 countertops | Foundation Millwork & Stone | 3rd Floor>302 | 2026-08-07 | 60 |
| 81 | 213 countertops | Foundation Millwork & Stone | 2nd Floor>213 | 2026-08-18 | 49 |
| 85 | 207 cabinets | Foundation Millwork & Stone | 2nd Floor>207 | 2026-08-18 | 49 |
| 87 | 203 cabinets | Foundation Millwork & Stone | 2nd Floor>203 | 2026-08-18 | 49 |
| 90 | 201 Cabinets | Foundation Millwork & Stone | 2nd Floor>201 | 2026-08-18 | 49 |
| 91 | 204 Cabinets | Foundation Millwork & Stone | 2nd Floor>204 | 2026-08-18 | 49 |
| 101 | 208 Cabinets | Foundation Millwork & Stone | 2nd Floor>208 | 2026-08-20 | 47 |
| 102 | 210 countertops | Foundation Millwork & Stone | 2nd Floor>208 | 2026-08-20 | 47 |
| 103 | 209 Countertops | Foundation Millwork & Stone | 2nd Floor>209 | 2026-08-20 | 47 |
| 104 | 211 Countertops | Foundation Millwork & Stone | 2nd Floor>211 | 2026-08-20 | 47 |
| 105 | 213 Countertops | Foundation Millwork & Stone | 2nd Floor>214 | 2026-08-20 | 47 |
| 106 | 213 Countertops | Foundation Millwork & Stone | 2nd Floor>213 | 2026-08-20 | 47 |
| 107 | 212 Countertops | Foundation Millwork & Stone | 2nd Floor>212 | 2026-08-20 | 47 |
| 92 | 101 countertops | Foundation Millwork & Stone | 1st floor>101 | 2026-08-21 | 46 |
| 94 | 103 countertops | Foundation Millwork & Stone | 1st floor>103 | 2026-08-21 | 46 |
| 95 | 104 countertops | Foundation Millwork & Stone | 1st floor>104 | 2026-08-21 | 46 |
| 97 | 105 countertops | Foundation Millwork & Stone | 1st floor>105 | 2026-08-21 | 46 |
| 98 | 111 countertops | Foundation Millwork & Stone | 1st floor>111 | 2026-08-21 | 46 |
| 99 | 112 countertops | Foundation Millwork & Stone | 1st floor>112 | 2026-08-21 | 46 |
| 100 | 113 countertops | Foundation Millwork & Stone | 1st floor>113 | 2026-08-21 | 46 |
| 109 | 213 Electrical | K.E.P. Electric, Inc | 2nd Floor>213 | 2026-08-31 | 36 |
| 110 | 211 Drywall | Precision Wall Systems LLC | 2nd Floor>211 | 2026-08-31 | 36 |
| 111 | 214 APPLIANCES | GE Appliances | 2nd Floor>214 | 2026-09-29 | 7 |
| 112 | 214 CABINET SCRIBE | Foundation Millwork & Stone | 2nd Floor>214 | 2026-09-29 | 7 |
| 113 | 212 DRYWALL | Precision Wall Systems LLC | 2nd Floor>212 | 2026-09-29 | 7 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 14 | Unit 402 - hvac wire running beneath ceiling. Needs to be moved into ceiling assembly. | Romanoff Heating & Cooling | 2026-09-07 | 29 | |
| 16 | All 4th floor units - exterior penetrations need fire caulked | Romanoff Heating & Cooling | 2026-09-09 | 27 | |
| 17 | All 4th floor units - line sets need caulked at top/bottom plate. | Romanoff Heating & Cooling | 2026-09-09 | 27 | |
| 18 | Unit 419 - kitchen island not square and needs bracing | KCL Framing | 2026-09-09 | 27 | |
| 23 | Stairs outside 204 - board uneven at top. Trip hazard | KCL Framing | 2026-09-18 | 18 | |
| 24 | Unit 214 shower chase | Precision Wall Systems LLC | 2026-09-21 | 15 | |
| 25 | Unit 320 Tape and mud tub chase | Precision Wall Systems LLC | 2026-09-21 | 15 | |
| 26 | Unit 311 Shower chase | Precision Wall Systems LLC | 2026-09-21 | 15 | |
| 27 | Unit 309 chase | Precision Wall Systems LLC | 2026-09-21 | 15 | |
| 28 | Unit 307 chase | Precision Wall Systems LLC | 2026-09-21 | 15 | |
| 30 | Unit 311 - missing shower chase lid | Precision Wall Systems LLC | 3rd Floor Units>311 | 2026-09-23 | 13 |
| 31 | Unit 309 - missing shower chase lid | Precision Wall Systems LLC | 3rd Floor Units>309 | 2026-09-23 | 13 |
| 33 | Missing windows | Holmes Lumber | 2026-09-28 | 8 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 29 | 312 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 312 5 O.C. | 2026-07-06 | 92 |
| 30 | 311 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 311 5 O.C. | 2026-07-06 | 92 |
| 31 | 310 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 310 7 | 2026-07-06 | 92 |
| 32 | 309 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 309 13 | 2026-07-06 | 92 |
| 33 | 308 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 308 4 | 2026-07-06 | 92 |
| 34 | 307 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 307 8 | 2026-07-06 | 92 |
| 35 | 306 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 306 8 | 2026-07-06 | 92 |
| 36 | 305 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 305 3 | 2026-07-06 | 92 |
| 37 | 304 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 304 13 | 2026-07-06 | 92 |
| 38 | 303 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 303 8 | 2026-07-06 | 92 |
| 39 | 302 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 302 5 O.C. | 2026-07-06 | 92 |
| 40 | 301 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - THIRD FLOOR PLAN>UNIT 301 5 O.C. | 2026-07-06 | 92 |
| 41 | 201 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - SECOND FLOOR PLAN>UNIT 201 5 O.C. | 2026-07-09 | 89 |
| 42 | 202 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - SECOND FLOOR PLAN>UNIT 202 5 O.C. | 2026-07-09 | 89 |
| 46 | 206 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - SECOND FLOOR PLAN>UNIT 206 8 | 2026-07-09 | 89 |
| 54 | 111 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - FIRST FLOOR PLAN>UNIT 111 5B O.C. | 2026-07-10 | 88 |
| 55 | 110 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - FIRST FLOOR PLAN>UNIT 110 7A | 2026-07-10 | 88 |
| 57 | 108 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - FIRST FLOOR PLAN>UNIT 108 4B | 2026-07-10 | 88 |
| 63 | 102 Romanoff Rough Punch | Romanoff Electric, Inc | BUILDING E>OVERALL - FIRST FLOOR PLAN>UNIT 102 5B O.C. | 2026-07-10 | 88 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 1 | Plumbing Amenity Space Punch | Mike Baumann Plumbing | 2024-08-23 | 774 | |
| 2 | JP9 Shade sail Amenity Space Punch | Capital City Awning Co. Inc. | 2024-08-23 | 774 | |
| 3 | Finish Landscaping in JP9 Amenity | Blendon Gardens | 2024-08-23 | 774 | |
| 4 | JP9 Amenity Space Punch | Holmes Lumber | 2024-08-23 | 774 | |
| 5 | JP9 Flat Black Punch | Flat Black, LLC | 2024-08-23 | 774 | |
| 6 | JP9 Punch Amenity punch Supior Steel | Suburban Steel Supply Co., LLC | 2024-08-23 | 774 | |
| 7 | JP9 Amenity Punch Wolfrum | Wolfrum Roofing & Exteriors, LLC | 2024-08-23 | 774 | |
| 8 | JP9 Amenity Electrical Punch | Romanoff Electric, Inc | 2024-08-23 | 774 | |
| 9 | JP9 Amenity space NNN punch | Triple N drywall | 2024-08-23 | 774 | |
| 10 | JP9 Amenity Space Rite Rug Punch | Rite Rug Co. | 2024-08-23 | 774 | |
| 12 | JP9 Amenity LC&G Punch | LC&G Multiservices LLC | 2024-08-23 | 774 | |
| 13 | JP9 Amenity Surface Tech Punch | Surface Tech Inc | 2024-08-23 | 774 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 1 | Exterior Zip Punch | KCL Framing | Exterior | 2025-11-28 | 312 |
| 2 | Gameroom Precision Drywall Punch | Precision Wall Systems LLC | Clubhouse>104 Game Rooom | 2026-06-04 | 124 |
| 3 | Community Room Precision Drywall Punch | Precision Wall Systems LLC | Clubhouse>103 Community | 2026-06-04 | 124 |
| 4 | Entry/Cowork Room Precision Drywall Punch | Precision Wall Systems LLC | Clubhouse>100 Entry/Co-Work | 2026-06-04 | 124 |
| 5 | Package Room Precision Drywall Punch | Precision Wall Systems LLC | Clubhouse>110 Package Room | 2026-06-04 | 124 |
| 7 | Sims-Lohman Punch | Sims-Lohman, Inc | Clubhouse | 2026-06-04 | 124 |
| 6 | Rite Rug Punch | Rite Rug Co. | Clubhouse | 2026-06-05 | 123 |
| 8 | Edgework Creative Punch | Edgework Creative | Clubhouse | 2026-06-05 | 123 |
| 9 | Holmes Lumber Punch | Holmes Lumber | Clubhouse | 2026-06-05 | 123 |
| 10 | All Secure Punch | All Secured Security Services LLC | Clubhouse | 2026-06-05 | 123 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 59 | 108 Mech Corridor | Contract Lumber | Building>OVERALL - FIRST FLOOR PLAN>MECH. 108A | 2026-08-07 | 60 |
| 86 | 447 - Holmes Lumber | Holmes Lumber | 2026-09-03 | 33 | |
| 87 | 445 - Holmes Lumber | Holmes Lumber | 2026-09-03 | 33 | |
| 94 | Contract Lumber Interior Trim 2nd Floor West Punch 9-17-26 | Contract Lumber | 2026-09-22 | 14 | |
| 95 | Sims-Lohman Cabinet 2nd Floor West Punch 9-17-26 | Sims-Lohman, Inc | 2026-09-22 | 14 | |
| 96 | Contract Lumber Interior Trim 2nd West NPO Items | Contract Lumber | 2026-09-28 | 8 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 1 | Maintenance Bldg KCL Frame Punch | KCL Framing | 2026-03-24 | 196 | |
| 3 | Maintenance Bldg - JB Hunt Interior Finish Punch | Whirlpool Corporation | 2026-06-18 | 110 | |
| 4 | Maintenance Bldg - Sims Lohman Finish Punch | Sims-Lohman, Inc | 2026-06-18 | 110 | |
| 5 | Maintenance Bldg - TG Interior Finish Punch | TG Plumbing & Mechanical, Inc. | 2026-06-18 | 110 | |
| 6 | Maintenance Bldg - Romanoff Interior Finish Punch | Romanoff Electric, Inc | 2026-06-18 | 110 | |
| 7 | Maintenance Bldg - Holmes Interior Finish Punch | Holmes Lumber | 2026-06-18 | 110 | |
| 8 | Maintenance Bldg - Rite Rug Interior Finish Punch | Rite Rug Co. | 2026-06-18 | 110 | |
| 9 | Maintenance Bldg - All Secure Interior Finish Punch | All Secured Security Services LLC | 2026-06-18 | 110 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 2 | Tyvek Inspection - 2248-2262 Quarry Trails - 2 | Thrive Construction | 2024-04-18 | 901 | |
| 1 | Tyvek Inspection - 2248-2262 Quarry Trails - 1 | Thrive Construction | 2024-04-19 | 900 | |
| 3 | Tyvek Inspection - 2248-2262 Quarry Trails - 3 | Thrive Construction | 2024-04-19 | 900 | |
| 4 | 2260 Appliance install unfinished. Needs hood installed | GE Appliances | 2024-09-27 | 739 | |
| 5 | 2252 Appliance install unfinished. Refrigerator and hood need installed | GE Appliances | 2024-09-27 | 739 | |
| 6 | 2250 Appliance install unfinished. Refrigerator, hood, and dishwasher needs installed. | GE Appliances | 2024-09-27 | 739 | |
| 7 | 2248 Appliance install unfinished. Hood and wall oven needs installed | GE Appliances | 2024-09-27 | 739 | |
| 8 | 2258 Appliance install unfinished. All kitchen appliances need installed. | GE Appliances | 2024-09-27 | 739 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 101 | 401 APPLIANCES | Elflein Property Solutions, GE Appliances | avenue.net new WWWV>PLAN FLOOR FOURTH>401 | 2025-11-14 | 326 |
| 105 | 202 APPLIANCES | Elflein Property Solutions, GE Appliances | avenue.net new WWWV>PLAN FLOOR SECOND>202 | 2025-11-16 | 324 |
| 106 | 202 PAINT | Triple N drywall | avenue.net new WWWV>PLAN FLOOR SECOND>202 | 2025-11-16 | 324 |
| 108 | 202 ELECTRICAL | Romanoff Electric Residential LLC | avenue.net new WWWV>PLAN FLOOR SECOND>202 | 2025-11-16 | 324 |
| 112 | 201 PAINT | Triple N drywall | avenue.net new WWWV>PLAN FLOOR SECOND>201 | 2025-11-16 | 324 |
| 114 | 201 ELECTRICAL | Romanoff Electric Residential LLC | avenue.net new WWWV>PLAN FLOOR SECOND>201 | 2025-11-16 | 324 |
| 115 | 201 APPLIANCES | Elflein Property Solutions, GE Appliances | avenue.net new WWWV>PLAN FLOOR SECOND>201 | 2025-11-16 | 324 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 3 | Unit 203 - missing patio doorway and header | KCL Framing | 2026-09-18 | 18 | |
| 2 | Unit 215 - repair or replace exacore boards. - DAMAGED | KCL Framing | 2026-10-02 | 4 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 797 | 437 SIMS LOHMAN | Foundation Millwork & Stone | 4th Floor Units>437 | 2025-05-24 | 500 |
| 843 | 435 GE | GE Appliances | 4th Floor Units>435 | 2025-05-25 | 499 |
| 1024 | 437 SIMS LOHMAN | Foundation Millwork & Stone | 4th Floor Units>437 | 2025-08-29 | 403 |
| 1025 | 419 SIMS LOHMAN | Foundation Millwork & Stone | 5th Floor Units>530 | 2025-08-29 | 403 |
| 1028 | 537 SIMS LOHMAN | Foundation Millwork & Stone | 5th Floor Units>537 | 2025-08-29 | 403 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 152 | 302 Finish Punch JB Hunt | JB Hunt, Whirlpool Corporation | BUILDING H>Third Floor>Unit 302 O.C. | 2026-01-12 | 267 |
| 333 | 104 Finish Punch JB Hunt | JB Hunt, Whirlpool Corporation | BUILDING H>First Floor>Unit 104 13B | 2026-01-14 | 265 |
| 395 | 1st Am exterior punch East side | 1st AM Construction LLC | BUILDING H>Exterior | 2026-07-03 | 95 |
| 404 | TEST | Holmes Lumber | BUILDING H | 2026-08-24 | 43 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 13 | Leasing-storefront doors | Ohio Glass and Aluminum | A Side (Bada/Leasing) | 2025-03-05 | 580 |
| 16 | Athletic-Locker rooms | Rite Rug Co. | A Side (Bada/Leasing) | 2025-03-05 | 580 |
| 8 | Leasing-ceiling | Rite Rug Co. | A Side (Bada/Leasing) | 2025-03-06 | 579 |
| 33 | Exterior- Siding | Wolfrum Roofing & Exteriors, LLC | 2025-03-28 | 557 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 93 | Maintenance Room - broken window frame. Top sash | Holmes Lumber | 1st Floor Common Area>Maintenance 013 | 2026-09-10 | 26 |
| 132 | Unit 302 - window grid falling off on 2 windows | Holmes Lumber | 2026-09-14 | 22 | |
| 135 | West side corridor window- broken part of vinyl frame. | Holmes Lumber | 2026-09-14 | 22 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 5 | Win-door issue | Holmes Lumber | 2026-09-28 | 8 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 4 | Door leak | Holmes Lumber | 2026-09-28 | 8 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 655 | Courtyard Door Punch Holmes Lumber | Holmes Lumber | 2024-11-05 | 700 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 50 | 306B Punch Paint/Drywall | Triple N drywall | 2025-03-29 | 556 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 6 | Exterior punch- steal post paint | Triple N drywall | 2023-09-15 | 1117 |
| # | Item | Business Partner | Location | Due | Days late |
|---|---|---|---|---|---|
| 1 | NHO - 2891 Kobuk - 402 | Thrive Construction | 2023-04-04 | 1281 |
Procore Inspections (checklist lists) by job. "Dated" lists have an inspection date; "items not inspected" is the share of checklist items never answered Pass, Fail or N/A. A list closed with unanswered items records nothing.
| Job | Lists | Dated | Last 30d | Items not inspected | Fails | Closed unanswered | Templates used |
|---|---|---|---|---|---|---|---|
| GVX - GVX Apts II Bldg ZZCourse of Construction | 47 | 6 | 0 | 77% | 153 | 43 | ZZ Building Cleanliness (13); ZZ Site Appearance (12); ZZ Site Cleanliness (12); ZZ Safety Checklist (6) |
| QTR - QT Apts III Bldg HCourse of Construction | 14 | 14 | 0 | 12% | 2 | 4 | Foundation - Concrete - 100% (2); Claddings - TPO and Scuppers (1); Claddings - Zip Board (1); Foundation - CMU (1) |
| QTR - QT Apts III Bldg DCourse of Construction | 9 | 9 | 0 | 51% | 0 | 1 | Foundation - CMU (1); Foundation - Excavation and Pre-Construction Meeting (1); Foundation - Footings (1); Foundation - Underground MEPs - 100% (1) |
| QTR - QT TH&F HB4 2867 KobukCourse of Construction | 8 | 8 | 0 | 95% | 0 | 0 | Foundation - CMU (1); Foundation - Excavation and Pre-Construction Meeting (1); Foundation - Footings (1); Foundation - Poured Walls (1) |
| QTR - QT Apts III Bldg CCourse of Construction | 6 | 6 | 0 | 57% | 0 | 0 | Foundation - CMU (1); Foundation - Excavation and Pre-Construction Meeting (1); Foundation - Footings (1); Foundation - Underground MEPs - 100% (1) |
| GVX - GVX Apts II Bldg QCourse of Construction | 4 | 4 | 0 | 43% | 0 | 1 | Foundation - Footings (1); General - Closing and Turnover Window 90-60-and 21-day - Checklist (1); Orientations - Ownership Electrical Walk -100% (1); Orientations - Pre-Drywall Walk (1) |
| 4&5 - 1206 N 4th Apts.Warranty | 3 | 3 | 0 | 97% | 0 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (2); General - QA - Checklist - 100% (1) |
| JPK - JP9 AptsWarranty | 3 | 3 | 0 | 0% | 0 | 0 | Tyvek Inspection - JP9 - West Side (2); General - Closing and Turnover Window 90-60-and 21-day - Checklist (1) |
| MTC - Franklntn Apts Phase CWarranty | 3 | 3 | 0 | 88% | 23 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (1); General - QA - Checklist - 100% (1); Pool - 100% (1) |
| QTR - QT Apts II Bldg QWarranty | 3 | 3 | 0 | 60% | 56 | 0 | General - QA - Checklist - 100% (2); General - Closing and Turnover Window 90-60-and 21-day - Checklist (1) |
| QTR - QT Apts III Community CenterCourse of Construction | 3 | 3 | 0 | 100% | 0 | 0 | Foundation - CMU (1); Foundation - Footings (1); Foundation - Underground MEPs - 100% (1) |
| QTR - QT TH&F HB3 2842 GunnisonCourse of Construction | 3 | 3 | 0 | 63% | 0 | 0 | Foundation - Excavation and Pre-Construction Meeting (1); Foundation - Footings (1); Orientations - NPO - HOA Turnover (1) |
| GPK - Grant Pk Apts 5 Bldg AWarranty | 2 | 2 | 0 | 74% | 0 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (1); General - QA - Checklist - 100% (1) |
| QTR - QT Apts II Bldg P1-P2Warranty | 2 | 2 | 0 | 100% | 0 | 0 | General - QA - Checklist - 100% (1); Orientations - Ownership Electrical Walk -100% (1) |
| QTR - QT TH&F PB3 2245-2259 Kings CanyonPre-Construction | 2 | 2 | 0 | 99% | 1 | 0 | General - QA - Checklist - 100% (1); Pre-Construction - For Sale (1) |
| 4&5 - 1206 N 4th GarageWarranty | 1 | 1 | 0 | 100% | 0 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (1) |
| GPK - Grant Pk Apts 5 Bldg BWarranty | 1 | 1 | 0 | 49% | 2 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (1) |
| GPK - Grant Pk Apts 5 Comm CtrWarranty | 1 | 1 | 0 | 70% | 1 | 0 | Pool - 100% (1) |
| GVX - 810 Apts Bldg PWarranty | 1 | 1 | 0 | 100% | 0 | 0 | Claddings - Stone (1) |
| JPK - J67 HB4 270 DickensonWarranty | 1 | 1 | 0 | 27% | 0 | 0 | Orientations - NPO - HOA Turnover (1) |
| JPK - J67 HB5 260 DickensonCourse of Construction | 1 | 1 | 0 | 0% | 24 | 0 | Pre-Construction - For Sale (1) |
| JPK - JND Garage Phase 9Warranty | 1 | 1 | 0 | 0% | 22 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (1) |
| JPK - JP9 Apts AmenityWarranty | 1 | 1 | 0 | 0% | 7 | 0 | Pool - 100% (1) |
| QTR - QT Apts III Bldg ACourse of Construction | 1 | 1 | 0 | 100% | 0 | 0 | Foundation - CMU (1) |
| QTR - QT Apts III Bldg GCourse of Construction | 1 | 1 | 0 | 80% | 0 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (1) |
| QTR - QT Apts III Maintenance BldgCourse of Construction | 1 | 1 | 0 | 77% | 0 | 0 | General - Closing and Turnover Window 90-60-and 21-day - Checklist (1) |
| QTR - QT TH&F HB5 2855 KobukCourse of Construction | 1 | 1 | 0 | 82% | 4 | 0 | Pre-Construction - For Sale (1) |
| QTR - QT TH&F HB6 2830 GunnisonCourse of Construction | 1 | 1 | 0 | 100% | 0 | 0 | Pre-Construction - For Sale (1) |
| QTR - QT TH&F PB4 2269-2283 Kings CanyonPre-Construction | 1 | 1 | 0 | 100% | 0 | 0 | Pre-Construction - For Sale (1) |
| WGR - Apts I - Bldg BPre-Construction | 1 | 1 | 0 | 88% | 0 | 0 | Orientations - Pre-Drywall Walk (1) |
| WGR - Apts I - Bldg EBidding | 1 | 1 | 0 | 21% | 0 | 0 | Foundation - CMU (1) |